ShU-60 and ShU-73 sludge traps are used for borehole flushing before iniaon of a perforang gun equipped with mechanical or hydro-mechanical firing head. The sludge trap is installed above the firing head at the distance of 1-2 tubes from it and ensures its reliable operaon.
- Glass disc of the sludge trap prevents clogging of the firing head;
- Circulaon holes are located above the glass disc providing free circulaon between the tubing and the casing annulus.
- Can be used without a glass disc for actuaon of hydraulic firing heads along the casing annulus.
Parameter | Value | |
---|---|---|
ShU-60 | ShU-73 | |
Tubing type for sludge trap run-in-hole | Tubing 60 | Tubing 73 |
Dri diameter, mm | 50 | 62 |
Total area of circulaon holes, mm2 | 3620 | 4700 |
Max weight conveyed on a sludge trap, t | 15 | 20 |
Capability, shoong, not less | 10 | |
Overall dimensions (diameter x length), mm | 73х190 | 89х240 |
Weight, kg | 2,6 | 4,6 |